Got an email from Mindful Living with pictures of the yurt being built. So far everything looks great. Here are the floor panels with insullation and sheathing.
Finished with getting the main demo completed. Just need to get the floor ripped out. Plenty of room now for construction. Also checked out the progress on the foundation. All formed, we should get inspection and pour sometime next week.
Here is the tentative schedule on what we will be doing each day to get the yurt up. I will be providing more info on each task later on. Wanted to get this out there.
Wednesday, Sept. 2 -Tuesday, Sept. 8, 2009 This is the starting date for getting the yurt materials and putting it together. I am hoping to get it finished in five days over the labor day weekend. If you can come, please sign the comments for this blog and let me know what days you will be there. I will update this page with info on food and lodging and how everything will get set up. For now, I'd just like to know your coming.
I tried pushing the demo too quickly. Went up the week after 4 of July. My body was still pretty soar from the week before. I ended up trying to move a cast iron, wood burning stove. It was just too heavy for my back. Ended up with a strain, and no work done. Took two hours to load my truck back up and go home battered and bruised. Here's the evil stove. I guess it will be there for the remainder of the project.
Took the trailer up to West Point for the long holiday. Coretta came up and we had some time to relax by the creek and bbq. Good to know the place is more than just a project. Did a little more demo and worked with my septic guy to trench out the stem wall footing. Another demo pictures and the foundation perimeter.
I went ahead and bought a trailer for people to stay in while we're working. Once we're finished, I guess this will become the guest house. Of course when the days hit 100 degrees, the AC might make this the place to be. I was planning on just renting one, but the cost is ridiculous compared to buying a used one. After a couple weeks searching, finally found a deal on one in good shape.
Here's the galley and table/sleeping quarter #1 Here's the living room, the couch turns into another bed. The Commode. And the bedroom that sleeps two.
Tore down the front half of the cabin. I plan to leave the living room/porch area for now. It's covered, screened in, and doesn't seem to have as much damage. If I need a place to store the futon, I think that parts habitable. The cabin came down pretty easy, with three hours, we had the roof and walls off. I got two trips to the dump, before heading home. You can see the damage I've made so far. Forgot to mention, I did have one problem. While I was loading the truck, I slid a piece of paneling in too far and blew out the back window. Replacement cost $185m, but I did get a sliding rear window out of it.
This is the first blog entry. While it's not the first post in order of this project. It's the first I'm putting down. Editor's be damned. I'm just gonna keep typing.
We decided last year that we wanted a get away. Oakland's too noisy and we need some damn peace and quiet. We bought an acre propert a half mile down a dirt road bordered by blm land. It's right on a creek. All we could hear was water. Seemed like the right location. Then we need a place to live. I thought about fixing up the cabin, but in the end a new structure was needed. This blog is about getting things in order so we can actually start visiting the place. I started this thing right in the middle of the project so some posts are out of order and based on train of thought. Still if you've read this far, start from the beginning to get the whole picture.