Tore down the front half of the cabin. I plan to leave the living room/porch area for now. It's covered, screened in, and doesn't seem to have as much damage. If I need a place to store the futon, I think that parts habitable. The cabin came down pretty easy, with three hours, we had the roof and walls off. I got two trips to the dump, before heading home. You can see the damage I've made so far.
Forgot to mention, I did have one problem. While I was loading the truck, I slid a piece of paneling in too far and blew out the back window. Replacement cost $185m, but I did get a sliding rear window out of it.
Tuesday, June 30, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment