Sunday, April 18, 2010

Pex

Pex is a plastic piping for potable water delivery. It is also used in radiant heating systems and has been around for about 40 years. It just last year became legal in California after a long battle with the plumbers union. It took all of an hour to run both a hot and cold water line through five walls, which was about 20feet. With the nature of the round walls, this would have been an enormous undertaking using copper. I ended up plumbing the entire house in about a day.
The picture below shows the whole house water filter and the pex manifold. The manifolds are the key to the pex delivery system.


This is a picture from the kitchen sink. It's also where the on demand hot water tank is located.
The tank is pretty amazing, though I haven't put it through a real test yest. It is rated to provide enough water to the entire house, and since it's electric, there's no need for venting.


A seperate manifold system for the bathroom.
Normally you would run a single hot and cold manifold to the entire house, but I found locating one set in the bath and one in the kitchen was a bit easier, especially with the extra materials I had on hand.

Sunday, March 21, 2010

Fire

Part of the winter was spent trying to get all of the trees cleared and the branches and debris burned. Coretta thought I should be burning down the old cabin, but it's much too close to the house. Also burning plywood and painted wood is nasty.



Sunday, March 14, 2010

Lights up



Got some exterior lights on as well now. First I put up some motion detector spot lights to get to the trailer at night. With the short winter days, I end up trudging back to the trailer in the dark, now I've got my path lit.

Also put some deck lights up, we decided on fixtures that kind of resemble the roundness of the yurt. I like the style, even if they are a bit nautical. I guess nothing wrong with that.


Sunday, February 21, 2010

Winter slowdown and Electric starts

It's been two months of winter here. I've slowed down showing up, as the rain, snow and cold have prevented me from wanting to work. I'm mostly indoors working on the electrical, planning and set up have taken longer than expected, but now that I'm laying lines, it shouldn't be too difficult.

The water heater is a bit ridiculous, takes 2 220 lines with 50amp breakers, that's a lot of juice running so close to the water line.

Friday, December 4, 2009

Deck Railing Up

I've gotten the railing up on the deck, Was a bit of a process as extra posts were involved instead of using the main support posts for the deck. Since this is from a kit I went with the layed out plan, but am not sure the necessity for extra posts. Was a lot of work as most of the center posts ended up butting into the center joist spacing of the deck itself. Still need to put a rail cap on, but will wait till the weather clears up, then I can stain the entire railing at once.
Here are a few pictures of the railing finished.




We also placed a deck stove for the winter, it's getting a bit chilly, not the best implementation, but it keeps the smoke off the deck.

Monday, November 2, 2009

Starting on interior lighting

I'm finally getting to work on the inside of the building. Now that it's cold and dark outside seems like good timing. First off I wanted to set up some interior ambient light to fill the room. I hate canned lighting and I didn't want to set up those cheap looking string lights. I was also thinking that LED lighting is almost ready for prime time. I've been using the flashlights for years, so I was happy to give it a try.
The other thing I've read about is that they are dimmable, wether this is true or not seemed questionable, but after putting them up, the dimmer did work great. Much like Fluorescent lighting, it can only dim to a certain point and then goes dead. Unlike the CFLs though, the lite doesn't flicker beforehand. Here's a picture of the install, lights up the room quite nicely, even when dimmed to half strength. Unfortunately, the image doesn't quite show it off as well as it could.

A couple pictures of the Soffit Trim I put up



More Trim Work and FInally the Deck

Finally got the deck done. Well mostly, the decking is in, need to get the last of the trim and the railing up. Hopefully finish with the exterior next time. Took two full days, and by full I mean into the dark. Of course it get's dark at 5 now, so that's not saying much. The pitcures don't look so good as they were all with a flash right before I left. More When I get back up there.


Wednesday, October 28, 2009

More Trim work


Work is moving forward, I'm down to once every two weeks or so. Spent a couple of days working on trim and getting the front door in. I've got wiring started, but it's all tempted in. Needed to focus directly on the electricity one of these weekends. Here are some pictures of the skylight trim. It's a couple small details, but much like the outside, I had to move the ladder around about twenty times to get it all installed.



And a couple pictures with the front door on. Looks like I still need to clean the place up a bit before the storms really hit.